FortisBC R.G. Anderson Capacitor Bank Upgrade

Client: FortisBC
Dates: March 2024 – July 2024
Duration: 4 months
Location: Penticton, BC, Canada

The project scope was to replace two end-of-life 69 kV shunt capacitor banks at FortisBC's R.G. Anderson (RGA) Terminal Station and upgrade the associated switching and protection equipment to meet FortisBC requirements and Mandatory Reliability Standards, with higher short-circuit ratings, and to improve operational efficiency. The existing banks were replaced with new fuseless capacitor units, and the capacitor bank protection was upgraded with new SEL-751 relays reconnected to the existing P&C schemes. The project was commissioned in December 2024.

Highlights & Services

  • Electrical, civil, structural, protection and control and SCADA design for the project, and integration into the existing schemes.

  • Replacement of two 69 kV capacitor banks, two 69 kV circuit switchers, disconnect switches, a set of new 69 kV CTs and neutral reactors.

  • Review of vendor drawings and coordinated incorporation of all new equipment into the existing substation layout and protection schemes.

  • New single-point grounding design for the capacitor banks.

  • The design was advanced on a tight schedule to meet the construction timeline, progressing IFC packages as equipment drawings were approved so construction could commence as scheduled.

  • As-built documentation, with lessons learned and key design information shared across the Gridwise team to support rapid integration of P&C resources into the project.

Switchyard structures and instrument transformers at FortisBC's R.G. Anderson Terminal Station