FortisBC Keremeos T1 Transformer and 43A Circuit Breaker Replacement

Client: FortisBC
Dates: June 2025 – December 2025
Duration: 6 months
Location: Keremeos, BC, Canada

FortisBC advanced this project following approval from the BC Utilities Commission to replace the existing Keremeos T1 transformer and the 43A minimum oil circuit breaker. Gridwise Engineering was engaged to complete the detailed multidisciplinary design and integrate the new equipment into the existing substation.

Highlights & Services

  • Electrical layout and switchyard design for the new transformer and circuit breaker.

  • Civil and structural design for new foundations and equipment supports.

  • Protection & control and SCADA design, including transformer protection, alarms, monitoring, metering and LTC circuits.

  • Development of detailed schematics using an SEL-2414-based LTC control solution.

  • Review of equipment manufacturers' drawings and technical documentation.

New T1 power transformer at FortisBC Keremeos Substation