345/34.5 kV 600 MVA Data Center Substation
Client: Confidential
Dates: May 2026 – August 2026
Duration: 4 months (in progress)
Location: Reno, Nevada, USA
The project involves a new 345/34.5 kV substation at a Nevada data center campus, interconnected to the local utility at 345 kV. Gridwise Engineering has been subcontracted to complete packages for the Electrical and Protection & Control design for the prime consultant. The substation includes a 345 kV breaker-and-a-half scheme with two incoming lines feeding five 345/34.5 kV transformers (90/120/150 MVA), with indoor 34.5 kV feeds to switchgear distributing to data center feeders. Total station capacity is approximately 600 MW with N+1 redundancy.
Highlights & Services
Engineering design for discrete packages within the new substation.
Review of the AIS 345/34.5 kV substation layout, sections and details.
Protection and control design using SEL relays: SEL-411L dual line current differential for the 345 kV lines, SEL-487E dual-zone transformer and bus differential, SEL-351S for 345 kV breaker failure and 34.5 kV bus overcurrent protection, and SEL-751 for 34.5 kV feeder and tie protection.
Completion of all P&C and SCADA schematics, panel layouts and wiring (over 400 drawings) in a three-month period.
Coordination with the prime consultant's electrical, architectural, civil and structural design.
Lighting study and lighting arrangement.
SCADA and communications design (SEL RTAC, redundant fiber optic paths) and integration of all protection functions into the station data acquisition system.