Southern California Edison Ely Substation 12 kV Disconnect Replacement & 66 kV Relay Replacement

Client: Southern California Edison (SCE)
Dates: January 2026 – Present
Duration: 6 months (in progress)
Location: Los Angeles, California, USA

Gridwise Engineering was engaged to complete the detailed Electrical and Protection & Control design for two coordinated sustainment scopes at SCE's Ely Substation. The first scope replaces the aging 12 kV hookstick load break disconnect switches with group-operated load break switches across all four 66/12 kV transformer banks, improving operability and switching safety. The second scope replaces the 66 kV Position 3 protective relays and re-taps the current transformer ratios across all 66 kV line and bus-tie positions, executed in coordination with the Barre SA3 program. Both scopes were designed concurrently to align outage windows and construction sequencing, with field work scheduled for the October-through-June bank outage period to avoid the need for a temporary bank.

Highlights & Services

  • Electrical and protection & control detailed design for both project scopes, delivered as a coordinated package.

  • Replacement of three hookstick load break disconnect switches with one group-operated load break disconnect switch on each of the four 66/12 kV transformer banks, reusing the existing dead-end structure locations.

  • Replacement of the primary overhead conductors to the load break disconnects, relocation of the neutral CTs to the new switch support channels, and the associated operating-handle arrangement on each bank dead-end structure.

  • Replacement of relay rack Z08 for 66 kV Position 3, retiring the legacy equipment and consolidating primary and backup protection onto a single new 19" rack equipped with SEL-411L and SEL-311C relays.

  • CT ratio re-tap to 1200/5 for the bus-side BCTs across all 66 kV positions.

  • Migration of the Position 3 SEL-311C from relay rack Z02 to the new Z08 rack, replacement of control and current homerun cabling, and integration of the new relays with the existing GPS/IRIG-B time source.

66/12 kV transformer bank at Southern California Edison's Ely Substation