FortisBC Warfield Terminal Station Upgrade

Client: FortisBC
Dates: March 2025 – May 2025
Duration: 2 months
Location: Trail, BC, Canada

Gridwise Engineering was engaged to complete the Electrical, Protection, Control and SCADA design for the Warfield Terminal Station expansion, a project required to replace the aging ASM Terminal Station and support growing demand in the Boundary and Similkameen regions. The project involved sustainment work and required BCUC regulatory approval. Gridwise Engineering worked closely with FortisBC to recover schedule delays and align the design with BCUC deadlines. The project was awarded to Gridwise Engineering after another engineering service provider was not able to complete the work in time.

Highlights & Services

  • Electrical, Protection, Control and SCADA design of a new 161 kV line to Grand Forks Terminal Station and two 161/63 kV transformers rated 90/120/150 MVA.

  • Design of controls for new 161 kV and 63 kV circuit breakers and motor-operated disconnect switches, and integration into the existing station protection and control schemes.

  • Review of vendor equipment drawings and integration of all new protection and control functions into the existing station.

  • Design of new line protection, transformer protection, tap changer control, metering and annunciation.

  • Construction support for installation and commissioning.

  • Completion of 144 drawings within a compressed 8-week design window, with design coordination meetings twice per week to maintain alignment and ensure efficient progress.